I have light, now for the heat!




My brother gave me a wood burning stove, and he came over yesterday to help me to fit it. I cleaned the stove thoroughly (wearing out 3 wire brush attachments in the process), to get it back to bare metalIt took about 15 hours to get it all done, as it was quite rusty in some places. And Cath at work supplied the chimney... Well, her dad did. Thanks for that, Cath's dad!

So, we cut a big hole in the roof, installed a collar (meant for barges, incidentally), manhandled the stove into position, then put the chimney in. A load of fire cement later, and we were ready for the test... Fired up the stove, and the job, as they say, is a good one!

The shot shows the back of my workshop, while the other shot below shows the front (the door end). The final shot is the window wall which contains my workbenches and drill station.

So what do you think? I like it, and it is light, warm (or hot, most of the time) and it even has a disco ball in the middle of the ceiling!

Saturday, 14 March 2009

OK... The workshop is (nearly) finished...



So, for the past few months I've been building the workshop so that I can carry on with the Lambretta rebuild. And I've reached the stage where I can move in, now. So this is what the workshop looks like from the outside...

As you can see, it needs a coat of paint, which I will do over Easter. It measures 16' by 8', and I built it myself from a big pile of wood. In total, the wood for the shed cost me about £1,200, but the ply is all exterior grade, and I treated all the timbers myself. I need to put a permanent roof on too, but for the moment it is weathertight.

The construction is double walled, which gave me space for the insulation, so the whole space is nice and warm and windproof. I was also lucky enough to get hold of some double glazed units (thanks, Hayley) which I fitted into the workshop. The original plan was to have a set of double doors to facilitate easy removal of scooters, but the single door is more than adequate, as it measures 1m x 2m... More than wide enough for even the fattest of Vespas!

Friday, 26 December 2008

The workshop build begins...

Started to build the workshop today. It was freezing. And I didn't get as much done as I wanted... It may be a while before it's completed...

Tuesday, 16 December 2008

I'm Building the Workshop!

Just ordered a big pile of wood, as Carol says that I can build my workshop! I'm going to make a well ace workshop which will enable me to carry on with the rebuild, so the scoot is on hold for a while until I get the accommodation sorted. Watch this space!